BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//CEEC CoE - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:CEEC CoE
X-ORIGINAL-URL:https://ceec-coe.eu
X-WR-CALDESC:Events for CEEC CoE
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Europe/Paris
BEGIN:DAYLIGHT
TZOFFSETFROM:+0100
TZOFFSETTO:+0200
TZNAME:CEST
DTSTART:20240331T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0200
TZOFFSETTO:+0100
TZNAME:CET
DTSTART:20241027T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0100
TZOFFSETTO:+0200
TZNAME:CEST
DTSTART:20250330T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0200
TZOFFSETTO:+0100
TZNAME:CET
DTSTART:20251026T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0100
TZOFFSETTO:+0200
TZNAME:CEST
DTSTART:20260329T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0200
TZOFFSETTO:+0100
TZNAME:CET
DTSTART:20261025T010000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Europe/Paris:20250701T000000
DTEND;TZID=Europe/Paris:20250705T000000
DTSTAMP:20260510T232557
CREATED:20250506T131441Z
LAST-MODIFIED:20250506T131441Z
UID:1541-1751328000-1751673600@ceec-coe.eu
SUMMARY:Fully-resolved LBM-DEM simulations of piping erosion during a suction bucket installation
DESCRIPTION:Join our Samuel kemmler in Himeji\, Japan for the 10th International Conference on Discrete Element Methods (DEM10) this summer! \nSuction bucket foundations are a cost-efficient and environmentally sustainable solution to install offshore wind turbines\, achieved through the application of growing suction pressure inside the bucket until its full embedment into the seabed. A key challenge for the installation process is the occurrence of piping erosion\, a phenomenon where fluidization of particles beneath the bucket wall tip causes a drop in suction pressure\, potentially leading to installation failure. Despite its significance\, the complex physical mechanisms driving piping erosion remain insufficiently understood. To address this knowledge gap\, a three-dimensional\, fully-resolved coupled LBM-DEM simulation is employed to conduct an in-depth analysis of piping erosion\, aiming to identify key influencing parameters\, thus enhancing understanding and optimizing the installation process. The simulation of physically relevant problem sizes – comprising hundreds of thousands of grains – is equivalent to computational intensities which demand for extensive computational resources. Results from simulations executed on hundreds of GPUs on the LUMI supercomputer are presented\, illustrating the method’s capability to tackle this complex challenge.
URL:https://ceec-coe.eu/event/fully-resolved-lbm-dem-simulations-of-piping-erosion-during-a-suction-bucket-installation/
LOCATION:Arcrea HIMEJI\, 143-2\, Kamiyacho\, Himeji-City\, Hyogo\, 670-0836\, Japan
END:VEVENT
END:VCALENDAR